Longtime D.C. jewelry mainstay Tiny Jewel Box became even
less tiny this week when it opened its expanded 8,000-square-foot boutique on
Connecticut Avenue NW.
Tuesday, 1 December 2015
Thursday, 19 November 2015
Setty at DC Streetcar permanent Car Barn Training Center
Setty signboard at DC Streetcar !
Construction on the permanent Car Barn Training Center (CBTC
II) began in spring 2015 and is expected to be commissioned in 2017.
Construction on the first phase of the Car Barn Training Center (CBTC I), which
comprises the yard and the temporary storage facility was completed in 2014.
Setty is providing MEP/FP design services for DC Streetcar permanent Car Barn
Training Center (CBTC II).
Labels:
Car Barn,
DC Streetcar,
MEP/FP Services,
Setty,
Signboard,
site
Location:
Washington, DC, USA
Thursday, 5 November 2015
Mayor Bowser and Councilmember Orange Announce Bold FY16 CBE Spending Goal
Mayor Muriel Bowser
and Councilmember Vincent Orange held a press conference to announce the Fiscal
Year 2016 (FY16) Certified Business Enterprise (CBE) spending goal. The
Bowser Administration also unveiled a new website, cbeconnect.dc.gov,
that will help CBEs better navigate the local government procurement process.
The FY16 expendable budget for
District government agencies is $634 Million, of which at least 50 percent, or
$317 Million, must be spent with CBEs. This feasible, but bold, spending
goal is the result of a top-to-bottom, data driven analysis of past practices
and current agency budgets.
In FY15, the Bowser Administration
spent more than $250 million through contracts with small businesses, which
exceeded the total amount spent in each of the past five years. The FY16
goal reflects the Mayor's commitment to build on the District's progress, and
to increase its support for small businesses.
Mayor Bowser launched cbeconnect.dc.gov to
both increase transparency in the goal-setting process and help CBEs navigate
the procurement process. The website offers a user-friendly platform to search for
procurement opportunities across District government. The Bowser Administration
will also release an 'Opportunity Guide' with an agency-by-agency overview of
CBE opportunities.
Monday, 26 October 2015
Civic Building and Veterans' Plaza received the First Annual Design Excellence Award from Montgomery County Planning Department
The Silver Spring Civic Building at Veterans Plaza has
won the First Annual Design Excellence Award, presented by the Montgomery
County Planning Department. As part of the Machado Silvetti team, Setty
provided MEP/FP design services for the civic building. The project is
recognized for its exceptional work in architecture, landscape architecture,
engineering, and urban design that will represent Montgomery County’s high
quality of design to the region, state, and nation.
The Award was presented at the “Celebrate Design” event on
October 22 in the Silver Spring Civic Building.
Wednesday, 14 October 2015
FCPS Saves $4.5 Million Through Energy Conservation; 146 Schools Earn Energy Star Certification
Fairfax County Public Schools (FCPS) has realized $4.5
million in energy savings as a result of the Cenergistic energy conservation
and management program, which began in February 2014. This effort began as one
of many throughout FCPS to reduce operating costs and increase efficiency. The
school district has also earned the Environmental Protection Agency’s (EPA)
Energy Star Certification for 146 school buildings, and has the highest number
of Energy Star-certified buildings in the country. SETTY is proud to be a
partner in this effort with our Commissioning and Design projects throughout
the county.
Labels:
conservation,
energy savings,
Energy Star Certification,
EPA,
FCPS,
Setty
Location:
Fairfax County, VA, USA
Monday, 5 October 2015
Setty Awarded Nationwide IDIQ Contract by USDA
SETTY awarded USDA Nationwide AE Indefinite Quantity Contact for A/E
Services for Research and Laboratory Facilities. Congratulations team!
Under this contract Setty will provide energy-related studies,
feasibility and conceptual studies, life cycle cost analyses, engineering
design criteria development, design analyses, designs, construction drawings,
specifications (including specifications for design-build), detailed cost
estimates and analyses, construction management/administration, construction
inspection and/or monitoring, design review, technical consultation, field
surveys, engineering reports, and computer-aided drafting.
Monday, 3 August 2015
The Upcoming SETTY Charity Bike Ride
Labels:
Bike ride,
Charity,
Fairfax VA,
Setty,
Washington DC
Subscribe to:
Posts (Atom)

